ASHEVILLE, NC – Motorists on Interstate 240 may see some traffic slow-downs today as state construction crews undertake bridge repair work.
According to the N.C. Department of Transportation, one of two lanes will be closed in each direction at various times between Exit 1 (Brevard Road) and Exit 3 (U.S. 19-23). Work was scheduled between 9 a.m. and 3:30 p.m.
One lane will be open to traffic at all times in both directions, according to DOT.